Skip to product information
1 of 1

DIY Gas Soft Wash Kit. Build It and Spray It

DIY Gas Soft Wash Kit. Build It and Spray It

Regular price $9,898.90
Regular price Sale price $9,898.90
Sale Sold out
Options

DIY Gas Soft Wash Kit – Build It and Spray It

Complete DIY gas soft wash kit. Everything you need to assemble a working AR45 / Honda GX200 electric-start system. You provide the labor, nuts, bolts, and hardware.

What’s included:

Power & system

  • AR45 Gas Soft Wash System — Honda GX200 electric start
  • Honda GX160 / GX200 fuel pump kit with hour meter
  • Remote start for GX160 / GX200
  • Remote metering system — Asahi valves
  • Deep cycle marine battery
  • Plastic battery box
  • Machine wiring harness for battery connection — 10 ft cables

Reels & hose

  • Stealth 12" aluminum full-frame hose reel, 1/2" manifold — manual or electric
  • Stealth 12" aluminum full-frame hose reel, 3/4" manifold — manual or electric
  • Stealth stacking kit
  • Electric reel wiring harness (stacked) — included if electric reels are selected
  • Stealth 5/8" ID soft wash hose, blue, 300 PSI — 200 ft
  • 100' x 3/4" contractor hose
  • 1/2" ID soft wash hose, yellow, 300 PSI — 10 ft
  • 3/4" ID soft wash hose, blue, 300 PSI — 35 ft
  • 1" ID suction hose, clear — 10 ft
  • 1" ID suction hose, blue — 30 ft

Plumbing & fittings

  • WaterBoss 750-1/2-L gun (factory orange)
  • 1" drop tube (bleach)
  • 1" bulkheads (3)
  • 1" 50-mesh strainers (2)
  • 1" PVC ball valves (2)
  • 1" poly nipples (2)
  • 1" MPT x 1" hose barb elbows (4)
  • 1" MPT x 1" hose barb straights (4)
  • 1/2" MPT x 3/8" hose barb straight (1)
  • Large, medium, and XL stainless hose clamps (15 each)

Optional add-ons

  • (2) 100-gallon slimline tanks and straps — SH and water
  • (1) 16-gallon holding tank and straps — auxiliary

What you provide

  • Labor
  • Nuts, bolts, and mounting hardware
  • Tank(s) if not added above
  • Truck, trailer, or skid platform

Shipping
Freight is billed separately at about $400. This ships on a pallet. Allow 3 days for packaging after the order is placed, then 1–2 days for freight pickup. There may be a short delay before it leaves.

Build it. Plumb it. Spray it.

Questions on layout or a different version of this kit? Reach out before you order.

View full details